Why a UV-cured conformal coating stays tacky
18 October 2026 · Checked against the ELANTAS Bectron PT 4600 TDS N°1875 Rev. 2 (02/2024, pp. 2–3) and the PT 4601 TDS dated 07/02/2012 (pp. 2–3, newest on file) on 2026-11-12
A UV-cured conformal coating that stays tacky has usually received too little UVA dose, or the tacky area lies in a shadow where the coating cures by moisture instead of light. For Bectron® PT 4600, the ELANTAS TDS (02/2024) specifies 2,500–3,500 mJ/cm² UVA (about 5 s at 3,000 mJ/cm² for a 200 ± 50 µm film), and 2 to 3 days for shadow areas.
Short answer: match the symptom to the TDS
| Symptom | Likely cause | What the PT 4600 TDS says (TDS 02/2024, p. 2) |
|---|---|---|
| Open areas tacky or soft right after the UV tunnel | UVA dose below the TDS value, or a film outside the thickness the dose refers to | 3000 mJ/cm² for a usual film thickness of 200 ± 50 µm, curing in approx. 5 s |
| Hard on open areas, soft under components | Shadow area, still curing by moisture | “Post-curing by moisture in shadow areas takes 2 to 3 days.” |
| Cured, but properties below expectation | Pre-curing by daylight or UV inspection lamps before the tunnel | “Sunlight or UV inspection lamps will start pre-curing, preventing the full development of the properties of the coating.” |
| Bubbles in the film | Residual washing water on the board | “Residual water from washing the PCB can cause bubbles.” |
What the coating needs: 2,500–3,500 mJ/cm² UVA
PT 4600 is a solvent-free one-component polyurethane thick-film coating, cured by UV irradiation and/or by moisture (TDS 02/2024, p. 2). PT 4601 is its thixotropic version for selective areas. Both TDSs give the same dose window; they refer it to different film thicknesses.
| Property | PT 4600 | PT 4601 | Unit | Method / source |
|---|---|---|---|---|
| UVA dose, mJ/cm² | 2,500–3,500 | 3000 ± 500 | mJ/cm² | PT 4600: TDS 02/2024 p. 3; PT 4601: TDS 07/02/2012 Table 2 |
| Exposure time at that dose, s | 3–7 | 5 ± 2 | s | PT 4600: TDS 02/2024 p. 3; PT 4601: Table 2 |
| Film thickness the dose refers to, µm | 200 ± 50 | 300 ± 50 | µm | TDS p. 2 |
| UV cure time, s | 5–10, “depending of the used type and power of the UV-lamp” | 5–10 | s | TDS p. 2 |
| Conveyor speed, m/min | 1–2.5 | 1–2.5 | m/min | TDS p. 2 |
| Viscosity as supplied, mPa·s | 400–900 (DIN 53229) | 1700 ± 600 (DIN 53019, D = 20 s⁻¹) | mPa·s | 23 °C; PT 4600: TDS 02/2024 p. 3; PT 4601: Table 1 |
| Hardness, cured, Shore A | 60–70 | 65 ± 5 | Shore A | ISO 868, 23 °C; PT 4600: TDS 02/2024 p. 3; PT 4601: Table 4 |
| Temperature range, cured, °C | −40 to +125 | −40 to +120 | °C | PT 4600: TDS 02/2024 p. 2–3; PT 4601: Table 3 |
Both TDSs say “UVA” and give no wavelength. We confirm with ELANTAS, case by case, whether a 365, 385, 395 or 405 nm LED head suits PT 4600 before we match a Hoenle unit to it. The 02/2024 revision gives the same dose window as the 2012 editions, written as 2,500–3,500 mJ/cm² instead of 3000 ± 500.
Reading the colour indicator: blue to green/yellow
PT 4600 is a “transparent thick film coating” (TDS 02/2024, p. 2) that is blue before cure; PT 4601 is blue as supplied (TDS 07/02/2012, Table 1). Both TDSs state that “a colour change from blue to green/yellow indicates the degree of UV-curing” (PT 4600: TDS 02/2024, p. 2). Open areas that are still blue after the tunnel show a low degree of UV cure by that indicator. The TDSs give no colour-versus-dose scale, so the colour confirms that UV reached an area; it does not replace a dose figure.
Shadow areas under components: 2–3 days, full properties after 2 weeks
Light does not reach the coating under tall components, connectors and BGAs. PT 4600 cures there by moisture: “Post-curing by moisture in shadow areas takes 2 to 3 days. Full polymerisation of the last <5 % will take place over 2 weeks achieving full properties of the material” (TDS 02/2024, p. 2; same wording in the PT 4601 TDS).
| Time after the UV tunnel | State of shadow areas per the PT 4600 TDS |
|---|---|
| 0 to 2–3 days | Moisture post-cure in progress; soft coating under components is within what the TDS describes |
| 2–3 days | Moisture post-cure complete |
| Up to 2 weeks | Last <5 % polymerises; full material properties reached |
A tack test on shadow areas straight after the tunnel therefore measures an intermediate state, not the final one.
Pre-curing before the lamp: daylight and UV inspection lamps
The PT 4600 TDS states: “The UV reactivity is high, so sunlight or UV inspection lamps will start pre-curing, preventing the full development of the properties of the coating” (TDS 02/2024, p. 2). The PT 4601 TDS carries the same warning. Coated boards that wait near windows, or that are checked for wet coverage under a UV inspection lamp before the tunnel, are exposed to this.
Conveyor speed and heat: the 1–2.5 m/min window
The TDS sets the belt speed: “The conveyor speed should be 1-2.5 m/min to limit influence of heat” (PT 4600 TDS 02/2024, p. 2). Slowing the belt below 1 m/min raises the dose but leaves that window. Inside the window, dose rises only with higher irradiance at the board, a shorter working distance or an additional lamp; doses from consecutive lamps add. The arithmetic is in the guide on UV dose on a conveyor, and the UV dose calculator runs it for your lamp.
Storage and moisture: why an opened container matters
PT 4600 cures by moisture as well as by UV (TDS 02/2024, p. 2). For that reason the TDS asks for sealed containers, “as the product is moisture sensitive”, and allows complete dipping or selective flooding only “in a machine with controlled atmosphere to exclude moisture”.
| Storage item | PT 4600 | PT 4601 | Source |
|---|---|---|---|
| Shelf life in closed original containers | 6 months: cartridges and 5 kg bladder bag at 5–10 °C; 5 kg steel pail at −10 to 25 °C | 3 months at max. 5 °C | PT 4600: TDS 02/2024 p. 2–3; PT 4601: TDS 07/02/2012 |
| Recommended maximum storage temperature | Not stated in the 02/2024 TDS (storage by pack, see above) | 5 °C | PT 4601: TDS 07/02/2012 |
| Longer storage | Not stated in the 02/2024 TDS | −18 °C | PT 4601: TDS 07/02/2012 |
| Containers | Sealed; product is moisture sensitive | Sealed; product is moisture sensitive | TDS p. 2 |
What to check on your line
| Check | Target from the TDS | Why |
|---|---|---|
| UVA dose at the board | 2,500–3,500 mJ/cm² | The dose the TDS cure data refers to (TDS 02/2024, p. 3) |
| Film thickness | 200 ± 50 µm (PT 4600); 300 ± 50 µm (PT 4601) | The thickness each TDS ties to that dose (p. 2) |
| Belt speed | 1–2.5 m/min | TDS limit for heat (p. 2) |
| Colour of open areas after the tunnel | Green/yellow, no longer blue | TDS cure indicator (p. 2) |
| Light exposure before the tunnel | No sunlight, no UV inspection lamp | TDS caution on pre-curing (p. 2) |
| Container handling | Sealed, stored per the table above | Moisture sensitivity (p. 2) |
| Batch viscosity | 400–900 mPa·s (PT 4600, DIN 53229, 23 °C) | Sales specification (TDS 02/2024, p. 3) |
| Board condition | Clean, dry, free from grease; low-solids flux or alcohol-based cleaners | TDS preparation section (p. 2) |
| Time before judging shadow areas | 2–3 days; full properties after 2 weeks | TDS curing section (p. 2) |
Getting a dose calculation for your line
Dose is irradiance multiplied by exposure time. Naltek calculates it for your line from lamp type, lens, working distance and belt speed, and compares the result with the 2,500–3,500 mJ/cm² in the PT 4600 TDS. If you want a measured value as well, we measure it on site during a visit.
Through the inquiry form, send the coating code, film thickness, belt speed, lamp model and lens, and working distance, and ask for the PT 4600 or PT 4601 TDS or a dose calculation.
Questions engineers ask
How long does PT 4600 take to cure under components?
Post-curing by moisture in shadow areas takes 2 to 3 days, and full polymerisation of the last <5 % takes place over 2 weeks, according to the ELANTAS PT 4600 TDS (02/2024, p. 2).
What UV dose does PT 4600 need?
2,500–3,500 mJ/cm² UVA in 3–7 s; for a usual film thickness of 200 ± 50 µm and 3,000 mJ/cm², curing takes about 5 s (PT 4600 TDS 02/2024, p. 2–3). The PT 4601 TDS (07/02/2012) gives 3000 ± 500 mJ/cm² for 300 ± 50 µm.
Why does the coating change colour from blue to green?
The PT 4600 and PT 4601 TDSs state that a colour change from blue to green/yellow indicates the degree of UV curing. The TDSs give no colour-versus-dose scale, so the colour is a visual check, not a dose measurement.
Can I inspect boards under a UV lamp before curing?
Not with PT 4600 or PT 4601. Both TDSs warn that the UV reactivity is high, so sunlight or UV inspection lamps start pre-curing and prevent the full development of the coating's properties.
Why not just run the conveyor slower to add dose?
The PT 4600 TDS says the conveyor speed should be 1–2.5 m/min to limit the influence of heat. To add dose inside that window, the irradiance at the board has to rise, or a second lamp has to be added.
Application pages: Conformal coating · UV curing